Step and spend budget

A limit on steps, repeats and money, so a confused agent stops and asks.

What it is
Hard limits per task: maximum steps, maximum repeats of the same action, maximum spend and time. Hitting a limit stops the run and escalates to a person with the trace.
When to use it
  • Always
When to skip it
  • Never skip it; tune the limits instead
Why (the trade-off)
A button that silently does nothing can make an agent click forever. Budgets turn an expensive loop into a cheap question.
Where it sits
Control layer, checked on every turn of the loop.
What it needs first
What can be added to it
Effect of adding it
  • cost —
  • latency —
  • reliability ↑
  • safety ↑
Risks it handles
  • A loop that burns money · full