ControlcoreReasoning

Thinking budget

A dial for how long the model may think: low for easy, high for hard.

What it is
A per-request cap on thinking tokens, or an effort level (low, medium, high). It trades accuracy against latency and cost.
When to use it
  • Always, when you call a reasoning model
When to skip it
  • Leaving it at maximum by default
Why (the trade-off)
Thinking tokens are output tokens: slow and billed. Gains are large at first and then flatten, and on easy tasks extra thinking can even hurt.
Where it sits
Control layer, a parameter on each model call.
What it needs first
What can be added to it
Effect of adding it
  • cost —
  • latency —
  • reliability —
  • safety —
Risks it handles
  • Problems it usually fails in one try · partial
  • Thinking far longer than needed · partial
  • A latency budget · partial
  • Thinking tokens multiply the bill · partial

depth 4+1 production note with numbers.